[tech] UCC Status Update 25/3

Bob Adamson bob at ucc.gu.uwa.edu.au
Thu Mar 25 14:50:49 WST 2010


Machine Room:
-roof has been unscrewed so that we can slide it to the side to get to the 
windows
-security is a priority, so the roof will be left in place until the 
glazier arrives
-would be awesome if we could design a new roof that is stronger and can 
be walked on
-portable aircon is in there, set on dehumidify
-any cables threaded through the roof frame have had to be taken down
-we need someone with clue who can go through the stuff on the top shelf

Clubroom
-still not vacuumed, not likely to happen in the near future as the floor 
has MR stuff all over it
-the carpet is dryish, and most people think it needs to be lifted so the 
floorboards underneath can dry. Comments?
-got a window open today (I had boarded it up just right)


Bob Adamson
UCC Treasurer

|"Bureaucracy is a challenge to the be conquered with a righteous        |
|attitude, an intolerance for stupidity, and a bulldozer when necessary" |
| ---Peter's Laws                                                        |



More information about the tech mailing list